PSC Environmental Impact Study Documents
Glacier Hills Wind Farm
- Glacier Hills Wind Turbine Impact Study
- Pre-construction Avian Study
- EMF Study
- Evaluation Scientific Literature Wind Turbine Low Frequency Health Effects
- Transmission Study
- RENEW Wisconsin Brief
- Michael Vickerman Testimony
- Mick Sagrillo Testimony
Forward Wind Energy center
- Forward Wind Application
- Forward EIS Volume 1-Final (19.6 MB)
- Forward EIS Volume 2-Final (21 MB)
- Noise Level Test Plan
- Phase 1 Avian Risk Assessment
- Phase 1 Bat Risk Assessment
- Post Construction 2nd Interim Bird and Bat Report
- Assessing Bird and Bat Mortality at the Forward Energy Center, Final Report Prepared by: Steven M. Grodsky David Drake, Ph.D. Department of Forest and Wildlife Ecology University of Wisconsin-Madison, August 2011, PSC REF#:152052
Cedar Ridge
- Cedar Ridge Application
- Cedar Ridge Avian Study
- Cedar Ridge Bat Study
- Cedar Ridge Biological Report Avian Risk
- Cedar Ridge Biological Report Breeding Bird Study
- Cedar Ridge Biological Reports Wetland Assessment
- Cedar Ridge Community Agreements
- Cedar Ridge Noise Analysis
xxx


